Travelodge, Wimbledon
Project description
Mountford Pigott was appointed by Reef Estates to develop a sustainable design for construction and to provide delivery stage services to the Main Contractor Barnes Construction.
The development is located on a constrained central Wimbledon site and the design focuses on sustainability and energy conservation to achieve net-zero emissions. The accommodation comprises a 177-bedroom budget luxe hotel with a 116-cover restaurant/bar over two ground floor double-storey commercial units.
Sustainability measures include; low-energy lighting; motion sensing controls; aerated showers and taps; air source heat pumps designed to maximise efficiency in the heating and cooling system; and a blue/green roof which provide a habitat to encourage biodiversity and assists with rainwater attenuation as part of the SuDS. The development achieves a BREEAM “Excellent” standard and an Energy Performance Certificate “A” rating. The sustainability achievements of the development contribute towards meeting the project team’s zero-carbon and ESG goals.
Photography courtesy of Stewart Writtle
Client:
Reef Estates
Structural Engineer
GD Partnership
Quantity Surveyor:
Gardiner & Theobald
M&E Engineer:
Cudd Bentley
Principal Designer
PB Safety
Contractor:
Barnes Construction
Environmental Credentials:
See below
SUDs
Air Source Heat Pump
LED Lighting
Solar Control Glass
Reduced Water Usage
Green Roof
BREEAM